GAB was engaged to undertake refurbishment works on the Mulwala Water Tank No2 in NSW in 2016, The project involved stripping the existing coating system that had failed and supply a new 3 coat system. The works involved stripping some 2000 sqm of aged coating from the tank, GAB understood the clients strict environmental policies and put forward the method of using a robotic UHP crawler unit to strip the existing coating using 40,000psi UHP, The project was completed with contaminants and waste removed and disposed offsite.
Mulwala Tank No2